As per the recent NGT direction, all existing industrial/infrastructure/mining projects which are drawing ground water and have not obtained NOC for ground water withdrawal from CGWA, either due to its coming into existence prior to formation of CGWA or due to exemption from obtaining NOC as per earlier guidelines shall apply to CGWA for NOC. All Industrial / Infrastructural / Mining Projects which are either existing, new or are under expansion and requiring to withdraw ground water have to obtain NOC from CGWA. At BCPL, we have expert team of hydrologist and geologist for study and report preparation about ground water scenario in the area with rain water harvesting/recharging plan for permission from CGWA.